Joint Inspection Held at Bambolim to Plan Road Diversion for Foot Overbridge Erection

Regional News

Panaji: A joint inspection was conducted by various government departments at Bambolim to plan the necessary road diversion ahead of the lifting and erection of the Foot Overbridge (FOB).

The inspection aimed to assess the site conditions and coordinate the arrangements required for the smooth execution of the bridge erection work.

Particular attention was given to planning an appropriate road diversion to facilitate the movement of vehicles and minimise inconvenience to commuters during the operation.

Officials from the concerned departments participated in the inspection to discuss the necessary measures for traffic management, public safety and coordination during the execution of the work.

The planned diversion is an important preparatory step ahead of the lifting and erection of the Foot Overbridge. The coordinated efforts of the departments are expected to help ensure that the operation is carried out in an organised manner while reducing disruption to daily traffic.

Leave a Reply

Your email address will not be published. Required fields are marked *